Telemetry Documentation

Waterway Navigability Guide

Technical documentation for interpreting fairway depth forecasts, accessing geospatial telemetry layers, and configuring safe navigation thresholds.

1. Waterway Corridor Selection

NW-1 / NW-2

The platform monitors designated stretches of India's National Waterways. Choose between NW-1 Ganga (1,620 km corridor spanning Prayagraj to Haldia) and NW-2 Brahmaputra (891 km corridor from Dhubri to Sadiya). Each corridor is segmented into 10 km operational reaches with localized LAD tracking.

2. Least Available Depth (LAD) and Draft Rules

Standards

LAD values are reported in meters relative to the low water datum (LWD). Vessels operating under IWAI Class III specifications require a minimum LAD of 2.50 meters to maintain a safe under-keel clearance (UKC) of 0.30 meters. Reaches falling below 2.20 meters trigger automatic cautionary notices.

// Classification Thresholds

Navigable: LAD >= 2.50 m (Full draft transit permitted)

Conditional: 2.00 m <= LAD < 2.50 m (Daylight navigation only, reduced cargo)

Non-Navigable: LAD < 2.00 m (Shoal bottleneck, dredging required)

3. Telemetry Ingestion and API Integration

FastAPI REST

Logistics software and vessel management systems can query real-time fairway forecasts through the backend API. Pass the waterway code and station ID to retrieve latest sounding bathymetry and 12-month depth calendar forecasts.

# Query fairway depth by river reach

curl -X GET "http://localhost:8000/api/waterways/NW1/depth?station=patna" \

-H "Accept: application/json"

4. Automated Risk Early Warning

Alerts

Subscribe to automated shoal notifications and seasonal monsoon flood advisories. When hydrological gauges report abnormal discharge surges or sediment deposition along braided river bends, warning bulletins are dispatched to registered port controllers.